Bulletin Number | Vehicle Make | Vehicle Model | Model Year | Summary |
---|---|---|---|---|
L3-FSV-137 | NABI | 40LFW | 2010 | NABI: FRONT UNDERSTRUCTURE REPAIR. AS REQUIRED. BUSES WITH REPAIRABLE CRACKS IN THE UNDERSTRUCTRE IN AREAS NEAR THE RADIUS ROD ATTACHMENT. *JS<br /> |
SB-12-03-01 | NABI | 40LFW | 2010 | NABI: INFORMATION PROVIDED REGARDING CLARIFICATION ON MAINTENANCE PROCEDURE FOR THE COOLANT LEVEL ON CERTAIN BUSES. MODELS 40LFW, 31LFW. NO MODEL |
L3-FSV-129 | NABI | 40LFW | 2010 | NABI: CEILING PANEL ATTACHMENTS WORKING LOOSE. INSTALL STAINLESS STEEL RIVETS PER THIS WORK INSTRUCTION, TO ENHANCE DURABILITY. *JS<br /> |
SB-L3-FSV-124 | NABI | 40LFW | 2010 | NORTH AMERICAN BUS INDUSTRIES, INC (NABI): THE LOCATION AND THE CHARGE AIR COOLER PIPE BRACKET HAS BEEN UPDATED TO ENHANCE ITS DURABILITY, WITH NEW C |
Subscribe for our latest newslatters
Know if there is a safety problem with your vehicles, tires or car seat, and how to get it fixed.